PROJECTS / WATER

Port Louis District-2014

2,1km Raw Water Feeder Pipeline

The project is for the supply and installation of a new 1000mm dia. ductile iron pipeline 2.1kms long for delivery of raw water from the dam at the Municipal Dyke to the Pailles Water Treatment Plant. The work includes the new intake works at the dam wall; two river crossings of the Grand River North West in the river bed plus refurbishment of the existing and leaking 675mm dia. reinforced concrete pipeline running parallel and adjacent to the new pipeline.

  • Project Title

    PROJECT TITLE

    Construction of Feeder Pipeline from Municipal Dyke to Pailles Water Treatment Plant:
    Contract CWA/C2012/145
    Reference: STC 451

  • Project Facts

    PROJECT FACTS

    Project Duration: 12 months
    Contract Value: Rs 166 million
    1000mm DI Pipes: 2,100 m
    Rehabilitation of 2,100 m of existing 675 mm RC pipe

  • Challenges

    CHALLENGES

    -Two major river crossings.
    -Working along narrow tracks at the foot of high cliffs and at the edge of deep river embankments
    -Working adjacent to 3 existing pipelines in confined space.

  • Client Team

    CLIENT TEAM

    Employer: CWA
    Project Manager: CWA

    SOTRAVIC TEAM

    CM: Maurice Hiu
    PM: Naden Ramasawmy