PROJECTS / EQUIPMENT & LOGISTICS

Rodrigues-2009

Marine Dredging of 20,000 m3 material

This project for the dredging of the access channel in Port Mathurin, Rodrigues has been carried out by Sotravic for the Mauritius Port Authority in 2009. More than 20,000 m3 of mud and trash were removed from the access channel on the western side of the Port Area to increase the depth of the channel to allow navigation of fishing boats even at low tide.  The project also provided shelter for the Port tugboat in bad weather conditions. Sotravic mobilized its dredger Watermaster Classic III to Rodrigues for execution of the project.

  • Project Title

    PROJECT TITLE

    Desilting Works at Port Mathurin
    Internal reference: SOC 201

  • Project Facts

    PROJECT FACTS

    Project Duration:  6 months
    Project Value: Rs 25million
    Equipment: Watermaster Classic III Dredger.

  • Challenges

    CHALLENGES

    Working in high tides.
    Discharge pipe of 2 km long.

  • Client Team

    CLIENT TEAM

    Employer : Mauritius Ports Authority

    SOTRAVIC TEAM

    PM: Vincent Puran
    SA : Enrico Van Schellebeck.