PROJECTS / WATER

Pamplemousses District-2007

770ha Centre Pivot Irrigation

This Project to provide irrigation to 770 ha of land belonging to Small Planters was carried out as a Design-Build, Turnkey Contract. The work required the replacement of an existing out-dated irrigation system by a modern, hi-tech system using fully telemetry remote controlled Centre Pivots of up to 450m radius and solid sets for inaccessible areas. The Contract required the design, procurement, installation and commissioning of the complete system including water supply mains, pumps, filters, in-field pipe networks and control systems, in-field electrical and telemetry installations, SCADA as well as the 15 Centre Pivot and 14 Solid Set irrigation units.

  • Project Title

    PROJECT TITLE

    Conversion from High Pressure Sprinklers to Centre Pivot and Solid Set System in the Northern Plains Irrigation Project Stage I Phase II & III (770 ha)

    Contract MSA 01/NPIP-I: PIV/SSIS/01

  • Project Facts

    PROJECT FACTS

    Project Duration: 72 weeks
    Contract Value: Rs 139 million
    Irrigation Area: 770 ha
    Centre Pivots: 15 nos.
    Solid Set Sprinklers: 14 nos.
    Irrigation Pipelines: 45.6 km

  • Challenges

    CHALLENGES

    Design and procurement of sophisticated equipment from overseas within a short time.

    Coordination of work within growing and harvesting seasons

  • Client Team

    CLIENT TEAM

    Employer: Mauritius Sugar Authority
    Project Manager: Luxconsult 

    SOTRAVIC TEAM

    CM: Joseph Kong
    PM: Armio Lafleur