PROJECTS / WATER

Moka District-2011

13,6km Potable Water Pipeline

This potable water supply project comprised of the supply of pipes, valves and fittings and civils works for the construction of pressure pipelines in trenches long public roads and tracks. Pipes were mainly 500mm DI with some lengths of 800mm DI and 200mm HDPE pipes. The work required major road diversion measures, restricted working due to traffic conditions and existing services, three bridge crossings and a section with 8.0m deep excavations to accommodate a future highway.

  • Project Title

    PROJECT TITLE

    Cybercity, Ebene and Highlands Supply Project Phase 1: Contract MW35 – Construction of pipelines for Camp Fouqereaux and Alma Regions.
    Internal reference: STC 427

  • Project Facts

    PROJECT FACTS

    Project Duration: 18 months
    Contract Value: Rs 306 million
    800mm DI Pipes: 600 m
    500mm DI Pipes: 10,000 m
    200mm DI Pipes: 3,000 m
    Reinstatement: 50,000 m2
    House Connections 552 no

  • Challenges

    CHALLENGES

    800mm Main line had to be installed in 8m deep trench excavations congested with other services during the rainy season.

  • Client Team

    CLIENT TEAM

    Employer: CWA
    Project Manager: CWA

    SOTRAVIC TEAM

    CM: Joseph Kong
    PM: Naden Ramasawmy