PROJECTS / WASTE & ENERGY

Grand Port District-2012 – in progress

23 Ha Landfill Site Construction

The contract for the continuation of construction of the Mare Chicose Landfill Waste Site was awarded in 2006 followed by further contracts up to 2018. Since 2006, 8 waste cells have been constructed totalling 23 Ha with either HDPE or bentonite enhanced clay watertight linings with electronic leak detection and ground water and leachate drainage systems. Following waste placement further construction includes water and gas tight cell capping and drilling of gas extraction wells and the gas collection system. Ancillary works include access roads, gas flares, lined leachate collection ponds, hazardous waste cells, security measures etc.

  • Project Title

    PROJECT TITLE

    Construction of Cells at Mare Chicose Landfill Site
    Internal reference: SSC 100

  • Project Facts

    PROJECT FACTS

    Project Duration: 12 years
    Contract Value: Rs 1600 million
    New waste Cells: 235,000 m2
    Capping: 425,000 m2
    500mm gas wells: 260 No.
    Pipelines: 23,000 m

  • Challenges

    CHALLENGES

    Construction of embankments and linings in high rainfall area.
    Drilling and maintaining 500mm dia. gas wells up to 30m deep.

  • Client Team

    CLIENT TEAM

    Employer: Ministry of Local Govt.
    Employer’s Rep: GIBB (Mts)

    SOTRAVIC TEAM

    CM: Joseph Kong
    PM: Avinash Rajcoomar