<
PROJECTS / WATER
Mare Longue-2012
Transfer of Raw Water from Mare Longue Reservoir
This contract, awarded at the height of the severe drought of 2011 was for 600mm diameter DI pipeline for the emergency transfer of raw water from Mare Longue reservoir to Mare aux Vacoas reservoir. Extreme acceleration measures achieved completion 4 months ahead of the original 8 month programme.